Time and Work Quiz-1
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 10 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Average score |
|
Your score |
|
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Answered
- Review
-
Question 1 of 10
1. Question
1 pointsA can do a work in 15 days and B in 20 days. If they work on it together for 4 days, then the fraction of the work that is left is :
Correct
A’s 1 day’s work = 1 ; 15 B’s 1 day’s work = 1 ; 20 (A + B)’s 1 day’s work = 1 + 1 = 7 . 15 20 60 (A + B)’s 4 day’s work = 7 x 4 = 7 . 60 15 Therefore, Remaining work = 1 – 7 = 8 . 15 15 Incorrect
A’s 1 day’s work = 1 ; 15 B’s 1 day’s work = 1 ; 20 (A + B)’s 1 day’s work = 1 + 1 = 7 . 15 20 60 (A + B)’s 4 day’s work = 7 x 4 = 7 . 60 15 Therefore, Remaining work = 1 – 7 = 8 . 15 15 -
Question 2 of 10
2. Question
1 pointsA, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A do the work if he is assisted by B and C on every third day?
Correct
A’s 2 day’s work = 1 x 2 = 1 . 20 10 (A + B + C)’s 1 day’s work = 1 + 1 + 1 = 6 = 1 . 20 30 60 60 10 Work done in 3 days = 1 + 1 = 1 . 10 10 5 Now, 1 work is done in 3 days. 5 Whole work will be done in (3 x 5) = 15 days.
Incorrect
A’s 2 day’s work = 1 x 2 = 1 . 20 10 (A + B + C)’s 1 day’s work = 1 + 1 + 1 = 6 = 1 . 20 30 60 60 10 Work done in 3 days = 1 + 1 = 1 . 10 10 5 Now, 1 work is done in 3 days. 5 Whole work will be done in (3 x 5) = 15 days.
-
Question 3 of 10
3. Question
1 pointsA alone can do a piece of work in 6 days and B alone in 8 days. A and B undertook to do it for Rs. 3200. With the help of C, they completed the work in 3 days. How much is to be paid to C?
Correct
C’s 1 day’s work = 1 – 1 + 1 = 1 – 7 = 1 . 3 6 8 3 24 24 A’s wages : B’s wages : C’s wages = 1 : 1 : 1 = 4 : 3 : 1. 6 8 24 C’s share (for 3 days) = Rs. 3 x 1 x 3200 = Rs. 400. 24 Incorrect
C’s 1 day’s work = 1 – 1 + 1 = 1 – 7 = 1 . 3 6 8 3 24 24 A’s wages : B’s wages : C’s wages = 1 : 1 : 1 = 4 : 3 : 1. 6 8 24 C’s share (for 3 days) = Rs. 3 x 1 x 3200 = Rs. 400. 24 -
Question 4 of 10
4. Question
1 pointsA can do a piece of work in 4 hours; B and C together can do it in 3 hours, while A and C together can do it in 2 hours. How long will B alone take to do it? Correct
A’s 1 hour’s work = 1 ; 4 (B + C)’s 1 hour’s work = 1 ; 3 (A + C)’s 1 hour’s work = 1 . 2 (A + B + C)’s 1 hour’s work = 1 + 1 = 7 . 4 3 12 B’s 1 hour’s work = 7 – 1 = 1 . 12 2 12 B alone will take 12 hours to do the work.
Incorrect
A’s 1 hour’s work = 1 ; 4 (B + C)’s 1 hour’s work = 1 ; 3 (A + C)’s 1 hour’s work = 1 . 2 (A + B + C)’s 1 hour’s work = 1 + 1 = 7 . 4 3 12 B’s 1 hour’s work = 7 – 1 = 1 . 12 2 12 B alone will take 12 hours to do the work.
-
Question 5 of 10
5. Question
1 pointsIf 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same in 2 days, the time taken by 15 men and 20 boys in doing the same type of work will be:
Correct
Let 1 man’s 1 day’s work = x and 1 boy’s 1 day’s work = y.
Then, 6x + 8y = 1 and 26x + 48y = 1 . 10 2 Solving these two equations, we get : x = 1 and y = 1 . 100 200 (15 men + 20 boy)’s 1 day’s work = 15 + 20 = 1 . 100 200 4 15 men and 20 boys can do the work in 4 days.
Incorrect
Let 1 man’s 1 day’s work = x and 1 boy’s 1 day’s work = y.
Then, 6x + 8y = 1 and 26x + 48y = 1 . 10 2 Solving these two equations, we get : x = 1 and y = 1 . 100 200 (15 men + 20 boy)’s 1 day’s work = 15 + 20 = 1 . 100 200 4 15 men and 20 boys can do the work in 4 days.
-
Question 6 of 10
6. Question
1 pointsA can finish a work in 18 days and B can do the same work in 15 days. B worked for 10 days and left the job. In how many days, A alone can finish the remaining work?
Correct
B’s 10 day’s work = 1 x 10 = 2 . 15 3 Remaining work = 1 – 2 = 1 . 3 3 Now, 1 work is done by A in 1 day. 18 1 work is done by A in 18 x 1 = 6 days. Incorrect
B’s 10 day’s work = 1 x 10 = 2 . 15 3 Remaining work = 1 – 2 = 1 . 3 3 Now, 1 work is done by A in 1 day. 18 1 work is done by A in 18 x 1 = 6 days. -
Question 7 of 10
7. Question
1 pointsIn the beginning, Ram works at a rate such that he can finish a piece of work in 24 hrs, but he only works at this rate for 16 hrs. After that, he works at a rate such that he can do the whole work in 18 hrs. If Ram is to finish this work at a stretch, how many hours will he take to finish this work?
Correct
Ram’s 16 hr work = 16/24 = 2/3. Remaining work = 1 – 2/3 = 1/3.
Using work and time formula: This will be completed in 1/3 × 18 i.e. 6 hrs.
So, total time taken to complete work = 16 + 6= 22 hrs.Incorrect
Ram’s 16 hr work = 16/24 = 2/3. Remaining work = 1 – 2/3 = 1/3.
Using work and time formula: This will be completed in 1/3 × 18 i.e. 6 hrs.
So, total time taken to complete work = 16 + 6= 22 hrs. -
Question 8 of 10
8. Question
1 pointsA can do a piece of work in 10 days, and B can do the same work in 20 days. With the help of C, they finished the work in 4 days. C can do the work in how many days, working alone?
Correct
Their combined 4 day work = 4(1/10 + 1/15) = 12/20 = 3/5.
Remaining work = 1 – 3/5 = ⅖.
This means C did 2/5 work in 4 days, hence he can finish the complete work in 5/2 × 4 = 10 days.Incorrect
Their combined 4 day work = 4(1/10 + 1/15) = 12/20 = 3/5.
Remaining work = 1 – 3/5 = ⅖.
This means C did 2/5 work in 4 days, hence he can finish the complete work in 5/2 × 4 = 10 days. -
Question 9 of 10
9. Question
1 pointsA can do a piece of work in 12 days. B can do this work in 16 days. A started the work alone. After how many days should B join him, so that the work is finished in 9 days?
Correct
A’s work in 9 days = 9/12 = 3/4. Remaining work = 1/4.
This work was done by B in 1/4 × 16 = 4 days.
∴ B would have joined A after 9 – 4 = 5 days.Q.4.A and B can do a piece of work in 4 days,Incorrect
A’s work in 9 days = 9/12 = 3/4. Remaining work = 1/4.
This work was done by B in 1/4 × 16 = 4 days.
∴ B would have joined A after 9 – 4 = 5 days.Q.4.A and B can do a piece of work in 4 days, -
Question 10 of 10
10. Question
1 pointsA, B, C, and D can do a piece of work in 20 days. If A and B can do it together in 50 days, and C alone in 60 days, find the time in which D alone can do it.
Correct
D alone will take 1/20 – 1/50 – 1/60 = 4/300 = 1/75
⇒ 75 days to complete the work.Incorrect
D alone will take 1/20 – 1/50 – 1/60 = 4/300 = 1/75
⇒ 75 days to complete the work.