Standards and quality practices in Production, Construction, Maintenance and Services
Quiz-summary
0 of 10 questions completed
Questions:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
Information
Standards and quality practices in Production, Construction, Maintenance and Services
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading...
You must sign in or sign up to start the quiz.
You have to finish following quiz, to start this quiz:
Results
0 of 10 questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 points, (0)
Average score |
|
Your score |
|
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Answered
- Review
-
Question 1 of 10
1. Question
1 pointsStatement- (I) The concept of just-in -Time is operationalized when the exact number of units required are bought at each successive stage of production at the appropriate time.
Statement -(II) just-in-Time concept has been expanded to mean a manufacturing philosophy of eliminating waste.
Correct
both statement (I) and statement (II) are individually true; and statement (I) correct explanation of statement (II)
Incorrect
both statement (I) and statement (II) are individually true; and statement (I) correct explanation of statement (II)
-
Question 2 of 10
2. Question
1 points1.
List-I List-II(Problem areas) (Techniques)
A. JIT 1. CRAFT
B. Computer-assisted layout 2. PERT
C. Scheduling 3. Johnson’s rule
D. Simulation 4. Kanbans
5. EOQ rule
6. Monte CarloCorrect
A ) – 4, (B) – 1, (C) – 3, (D) – 6
Incorrect
A ) – 4, (B) – 1, (C) – 3, (D) – 6
-
Question 3 of 10
3. Question
1 points2.Match List-I with List-II and select the correct answer:
List-I
A. Just-in-time inventory and procurement techniques
B. Work-in-progress likely to be low compared to the output
C. Scheduling typically the most complex processes
D. Flexible manufacturing cellList-II
1. Intermittent production2. Repetitive production
3. Continuous production
4. Job production
Correct
2 3 4 1
Incorrect
2 3 4 1
-
Question 4 of 10
4. Question
1 points3.Assertion (A): Master production schedule drives the whole of production and inventory control system in a manufacturing organization.
Reason (R): Master production schedule is a list of daily and weekly work released by PPC to production.Correct
A is true but R is false
Incorrect
A is true but R is false
-
Question 5 of 10
5. Question
1 pointsWhich of the following are needed as the input data for materials requirement planning?
1. Weekly production schedule 2. Bill of material
3. Supplier leads time 4. Market forecast Select the correct answer using the code given belowCorrect
1, 2, 3 and 4
Incorrect
1, 2, 3 and 4
-
Question 6 of 10
6. Question
1 pointsWhich award is presented to different organizations for quality and excellent performance by president of USA ?
Correct
Malculm baldrige national award
Incorrect
Malculm baldrige national award
-
Question 7 of 10
7. Question
1 pointsBenchmarking determines
Correct
how the company is doing relative to others
Incorrect
how the company is doing relative to others
-
Question 8 of 10
8. Question
1 pointsStatistical process control (SPC) helps to determine.
Correct
if assignable causes are disturbing the process
Incorrect
if assignable causes are disturbing the process
-
Question 9 of 10
9. Question
1 pointsThe most frequently used framework for obtaining continuous improvement is.
Correct
the plane-do check act cycle
Incorrect
the plane-do check act cycle
-
Question 10 of 10
10. Question
1 pointsProcess capability
Correct
that meets and exceed design specification may be mistaken for an -out-of-control process
Incorrect
that meets and exceed design specification may be mistaken for an -out-of-control process